| APC Server Rack and Mount | Procurement of APC Server Rack Enclosure and Rack Mount Uninterrupted Power Supply (UPS) |
| Fiber Optic Extension | South King Fire & Rescue is now taking bids on a fiber optic extension at Station 60 in Federal Way. please see the documents for project details |
| Fire Maintenance Facility Fuel Tank Project | Provide and install a double wall steel above ground split cell (dual fuel capable) fuel tank.
This is to include ALL related fueling equipment to make the installation fully operational and capable of delivering both Gasoline and Diesel fuel.
Winning bidder will provide a remote fuel filling station (to re-fill the tank) and separate fueling hoses of 25’ in length for Diesel and Gasoline.
The total capacity (in gallons) will not exceed 600, however SKF&R understands that there may be manufacturer-specific limitations pertaining to capacity.
For this reason, SKF&R will allow a range of 400 to 600 gallons.
The final capacity MUST be noted on the BID form provided as part of the contract documents. |
| Grounds Maintenance 2019 | |
| Station 65 | Facility Improvements |
| Station 66 Fencing | fencing and automated gate including all electrical work and permitting |